PROFESSIONAL PRACTICE REVIEWER


FIVE METHODS OF COMPENSATION


% OF CONSTRUCTION COST.
MULTIPLE OF DIRECT PERSONNAL EXPENSES
PROFESSIONAL FEE + EXPENSES
LUMP SUM OR FIXED FEE
PER DIEM + REIMBURSIBLE EXPENSE
PROJECT CLASSIFICATION

GROUP 1 = Simplest, min. fin, structural, etc. (50 million & less = 6%)

Armories, Bakeries, Freight, Parking, Market, Warehouse

GROUP 2 = Moderate complexity, (50 million & less = 7 %)

Banks, City Halls, School, Mall, Motel, Apartment, Office Bldg

GROUP 3 = Exceptional char., large amount Structural, etc. (50 million & less = 8%)

Atomic Fac., Airport, Gym, Lab., Hotels. Hospital, Breweries,



GROUP 4 = Residence (Single Det & Duplex) (10 % of Proj. Const. Cost)



GROUP 5 = Monumental Bldg. (12 % of Proj Const. Cost)

Expo, Mausoleum, Museums


GROUP 6 = Repetitive Const. of Bldgs
1st Structure = Min. Basic fee

2nd Structure = 80 % of Basic F

3rd Structure = 60 % of Basic F

Succeding = 40 % of Basic F



GROUP 7 = Housing Projects (Several Res. Units on a Single Site)

1st Unit = 10 % of Proj. Const.Cost as BASIC FEE

2-10 Units = 1 unit + 60% of 1st Unit (Basic F)

11 & above = 10 units + 30% of 1st Unit (Basic F)



GROUP 8 = Interior & Landscaping Design (Extensive detailing)

Min Basic fee = 15% of Project Const Cost



GROUP 9 = for Alterations & Additions of Existing Bldgs

50% of the total of 150% of the Basic Fee



GROUP 10 = Consultation and Arbitrations



Architects Services & Compensations


UAP DOC 201 PRE – DESIGN SERVICES

- Compensated on the basis of MULIPLE OF DIRECT PERSONNEL EXPENSE – 2 - 2.5

- Compensated for every technical hour

- Progress Payment




UAP DOC 202 DESIGN SERVICES

Upon Signing of Agreement = 5%

Upon Completion of Schemes (not >15 days) = 15%

Upon completion of Design Devt. = 35%

Upon Completion of Contract Documents = 85%

After Awarding of contracts = 85%

Balance = upon completion of Const Work

Work Suspended or Abandoned
The remaining 15% of his work to be paid by owner is:
10% - Arch. Liability under the civil code
5% - construction Services
UAP DOC 203 SPECIALIZED ALLIED SERVICES

Payment Schedule:

1. Upon Submission of preliminary design = 30 % of the fee

2. Upon Submission of Final design = 50%

3. Upon completion of he project = 20%


INTERIOR DESIGN SERVICES
Architects fee = 15% but it can be range 12% -20%

Consultants Fee = 5 %



ACOUSTICS, ECE SERVICES and LANDSCAPE DESIGN SERVICES

Architects fee = 10% - 15% Consultants Fee = 5 %

PHYSICAL PLANNING

TYPE 1 = 50 HEC or less = 5,000 / hec

TYPE 2 = 100 HEC or less = 3.000 / hec

TYPE 3 = 100 HEC or less = 2,000 / hec.

*the above stipulated rate is for moderately flat land

If the land is rugged w/ steep terrain the fee shall inc. 30 %

Environmental Planner – Concerned w/ the management & use of lands/conservation

Fees = Physical Planning Prof. Fess + expenses



UAP DOC 204 CONSTRUCTION SERVICES

Quality Control of Work, Evaluation & Const. Work, Keeping of Records, Reports & Contracts Doc.,



Architects as FULL TIME SUPERVISOR = 1% - 1 ½ % of Const Cost

Architects as CONSTRUCTION MANAGER = 1 ½ % - 3 % of Const Cost

-coordination & supervision, cost & time control, quality control of work.



UAP DOC 205 POST - CONSTRUCTION SERVICES

Bldg & Equipment Maintenance, Bldg & Ground Admin., Post –Construction Evaluation

Compensation = Salary Basis (fixed monthly/daily)
or Management fee ( 4 % - 6 % gross rentals)


UAP DOC 206 COMPREHENSIVE ARCHITECTURAL SERVICES

Scope: Pre- Design to Post Construction Services



Project Manager = (2 % - 5 % of Estimated Project Cost)
-Coordinates the whole range of Comprehensive arch.



UAP DOC 207 DESIGN- BUILD SERVICES

Architects is liable of both design & Construction

TYPES:

1. Design- Build Services by Administration = 7% + Architects fee on Regular D Services

2. Design – Build Services on a Guaranteed Maximum Cost = 10% + Architects fee on RDS

3. Design – Build Service on Lump Sum Contract



UAP DOC 208 SELECTION OF ARCHITECTS



UAP DOC 209 COMPETITION CODE



UAP DOC 301 GENERAL CONDITIONS



UAP DOC 307 PRACTICAL SPECIFICATIONS WRITING



UAP DOC 200 CODE OF ETHICAL CONDUCT





PP – UAP DOC. 211 (RA 545, PD 223, LOI 1000) – Prof. Regulatory Laws Governing the Practice of Architecture

RA 545 – an act to regulate the practice of architecture in the Philippines.

PD 223 – Creating the professional regulation commission and prescribing its powers & functions.

LOI 1000 – Letter of Instruction

PD 1096 National Building Code.

BP 344 An act to enhance The mobility of disabled persons.

PD 1185 Fire Code of the Philippines

RA 386 Civil Codes of the Philippines

(Contracts and Obligations)

PD 957 Subdivision Law

BP 220 Zoning Regulations


PD 856 Sanitation Code of the Philippines